Image Caption

LPG PLANT CUSTODY TRANSFER ORIFICE GAS METER

USER: ARSYNERGY RESOURCES

PROJECT: Bukit Tua LPG Plant Custody Transfer Orifice Gas Meter

LOCATION: Bukit Tua, Gresik, Jawa Timur

YEAR: 2015

DESCRIPTION: Gas Metering Skid 3 Stream 8" Pipeline integrated with Omni Flow Computer Panel and HMI Wonderware Intouch

Image Caption

ADDRESSABLE FIRE DETECTION SYSTEM

USER: ENI MUARA BAKAU B.V

PROJECT: Addressable Fire Detection System For Jangkrik Complex Project

LOCATION: Jangkrik - Karimun

YEAR: 2015

DESCRIPTION: Fire Addressable Detection Panel using Autronica Fire Alarm Controller Series BS-420 Certified SIL-2 integrated with Autronica Detector

Image Caption

FPSO BROTOJOYO FIRE GAS AND ESD SYSTEM

USER: BLT BROTOJOYO

PROJECT: Upgrade PLC HIMA

LOCATION: Kapal Brotojoyo

YEAR: 2015

DESCRIPTION: Upgrade PLC HIMA on Fire and Gas and ESD System Brotojoyo

Image Caption

FIRE SUPPRESSION PANEL SYSTEM (FSPS)

USER: PETRONAS CARIGALI SDN, BHD

PROJECT: Fire Suppression System

LOCATION: Dulang & Angsi, Malaysia

YEAR: 2015

DESCRIPTION: Fire Suppression Panel System using Aadvance ICS Triplex Rockwell

23 TEAM MEMBERS
81 PROJECTS
34 CLIENTS
11 PARTNERS
CLIENT LIST

PROJECT LIST

NO DESCRIPTION CLIENT LOC YEAR
1 Fire & Gas Detection Installation PHE WMO - PHE WMO PHE WMO KE #5 June 2017
2 Fire Addressable Detection Panel using Autronica Fire Alarm Controller Series BS-420 Certified SIL-2 integrated with Autronica Detector ENI MUARA BAKAU B.V Jangkrik - Karimun February 2015
3 Fire Suppression Panel System using Aadvance ICS Triplex Rockwell PETRONAS CARIGALI SDN, BHD Dulang & Angsi, Malaysia March 2015
4 Performance Test SINOHYDRO - PLTU KALTIM (TELUK BALIKPAPAN) Teluk Balikpapan - KALTIM June 2016 - On going
5 Commissioning Works SINOHYDRO - PLTU KALTIM (TELUK BALIKPAPAN) Balikpapan June 2016 - On going
6 Mechanical Erection PT. ADHI KARYA - PLTU KALTIM (TELUK BALIKPAPAN) Teluk Balikpapan - KALTIM March 2016 - On going
7 Engineering-FAT-SAT DCS, F&G, Fire Alarm System for Jangkrik Project SAIPEM - PT. HONEYWELL INDONESIA Jakarta ? Korea - Karimun May 2015 - On going
8 Commisioning MICC -MCL TRIPATRA - PT. HONEYWELL INDONESIA Cepu Bojonegoro February 2015 - On going
9 Retrofit F & G System PHE#5 PHE-WMO Jakarta ? OffShore Madura January 2016 - On going
10 Scada Pack PHE-WMO OffShore Madura March 2016 - On going
11 Staging Secure Area PT. KUARTA POWERINDO PERKASA Jakarta February 2016
12 Orifice Gas Metering System Package (Double Stream) MUTIARA ENERGY Karawang August 2015 - On going
13 Supply Material Insulation Joint MENARA GADING PUTIH Jakarta July 2015
14 Supply Material Pressure Transmitter MENARA GADING PUTIH Jakarta July 2015
15 Supply Material Aadvance Processor Base Unit DWISOLAR SDN BHD Malaysia June 2015
16 Supply Material Wiring Board PEARL OIL Balikpapan June 2015
17 Gas Metering Skid 3 Stream 8" Pipeline integrated with Omni Flow Computer Panel and HMI Wonderware Intouch ARSYNERGY RESOURCES Bukit Tua, Gresik, Jawa Timur May 2015
18 Engineering & Supply Control Valve MENARA GADING PUTIH Jakarta May 2015
19 Fire Suppresion System for Tapis Platform DWISOLAR SDN BHD Malaysia May 2015
20 Engineering & Supply Pressure Safety Valve MENARA GADING PUTIH Jakarta April 2015
21 Fire Suppresion System Upgrade for Dulang & Angsi Platform DWISOLAR SDN BHD Malaysia March 2015
22 Supply Material Portable Lightning and Shim Set PREMIER OIL Jakarta March 2015
23 Engineering & Supply Level Transmitter, Level Indicator/Gauge, Pressure Switch and Union Flange Orifice Meter MENARA GADING PUTIH Jakarta March 2015
24 FADP (Autronica), Addressable Fire Detection System for Jangkrik Complex Project PT. KUARTA POWERINDO PERKASA Jangkrik February 2015 - On going
25 Panel Metering for Mini LPG Plant JATA Project YUSONDA MAHAYASA NUSANTARA Banyuasin- Sumsel February 2015
26 Upgrade PLC HIMA on Fire and Gas and ESD System Brotojoyo BLT BROTOJOYO Kapal Brotojoyo February 2015
27 Supply Material Filter 2 Mikron PEARL OIL Jakarta February 2015
28 Supply Material Fisher Valve Parts PEARL OIL Jakarta January 2015
29 Supply Material Calibration Head and Screw PEARL OIL Jakarta January 2015
30 Engineering & Supply Pressure Regulator Valve KCS Jakarta November 2014 - November 2015
31 Supply Material Solenoid Valve PEARL OIL Jakarta November 2014
32 Supply Material Gland Packing FisherValve PEARL OIL Jakarta October 2014
33 ORF# Provision Moisture Analyzer PHE-WMO Gresik July 2014
34 Supply Material Spacer Ring PEARL OIL Jakarta July 2014
35 Pengadaan Material dan Jasa Pengerjaan Warehose Thp. 2 PT. KUARTA POWERINDO PERKASA Jakarta May 2014
36 Pengadaan Material dan Jasa Pembangunan Warehose PT. KUARTA POWERINDO PERKASA Jakarta May 2014
37 SVC-PROF ENGRG Material dan Jasa Pengerjaan PO No. ID2-E-6812 PT. KUARTA POWERINDO PERKASA Jakarta May 2014
38 SVC-PROF ENGRG Material dan Jasa Pengerjaan PO No. ID2-E-6823 PT. KUARTA POWERINDO PERKASA Jakarta May 2014
39 Service Engineer Contract ID2-E-6822 PT. KUARTA POWERINDO PERKASA Jakarta May 2014
40 SVC-PROF ENGRG Material dan Jasa Pengerjaan PO No. ID2-E-6871 PT. KUARTA POWERINDO PERKASA Jakarta May 2014
41 Service Supporting for FAT ORF ID2-E-6957 PT. KUARTA POWERINDO PERKASA Jakarta May 2014
42 Supply Material PCV Self Contain Regulator PEARL OIL Jakarta April 2014
43 Supply Material Pneutrol Instrumentation Valve SS PEARL OIL Jakarta April 2014
44 SCADA Package (PCS, SIS, RTU) BSP (BUMI SIAK PUSAKO) SIAK February 2014
45 HIPPS (High-integrity pressure protection system PHE-WMO Gresik November 2013 - November 2014
46 ORF - Fire and Gas System Controller Assessment for Retrofit PHE-WMO Gresik November 2013
47 PPP ? Fire and Gas detection System Assessment PHE-WMO Offshore PHE WMO November 2013
48 KE5-CPP - Fire and Gas System Controller Assessment for Retrofit PHE-WMO Offshore PHE WMO November 2013
49 E & I Man Power Supply For Maintenance Contract at PT. Lontar Papirus Pulp and Paper PT. LONTAR PAPIRUS PULP AND PAPER Jambi September 2013
50 I & C Man Power Supply for Engineering, Commissioning and Startup. PT. ZUG PLTU SANGGAU 2 X 7 MW, KALIMANTAN BARAT Desember 2012 - Desember 2014
51 I & C Man Power Supply for Engineering, Design graphic for HMI, create logic and Assembly DCS, TSI, ETS system cabinet PT. ZUG PLTU SUMBAWA 2 X 7 MW, NUSA TENGGARA BARAT Desember 2012 - Desember 2014
52 I & C Man Power Supply for Engineering, Design Graphic for HMI, Create Logic Control and Design TSI,ETS,DCS System Cabinet PT. ZUG PLTU SINTANG 3 X 7 MW, KALIMANTAN BARAT Desember 2012 - Desember 2014
53 I & C Man Power Supply for Engineering, Design Graphic for HMI, Create Logic Control and Design TSI,ETS,DCS System Cabinet PT. ZUG PLTU ROTE 2 X 3 MW, NUSA TENGGARA TIMUR Desember 2012 - Desember 2014
54 Tie In New Metering System with Master Logic Existing PHE ONWJ Cilamaya Plant PHE-ONWJ - PPS Cilamaya Desember 2012 - Desember 2013
55 Material Supply for Power Control New Oil PT. GRAMA BAZITA Cikarang July 2012
56 Material Supply For Unilever Project PT. GRAMA BAZITA Cikarang June 2012
57 Material Supply For Unilever Liquid PT. GRAMA BAZITA Cikarang April 2012
58 Instrument Commissioning For SSPC (Shell Sabah Petroleum Company) Malaysia Through IME (IntisariMulia Engineering) INTISARIMULIA ENGINEERING - SINOHYDRO Malaysia March 2012
59 Modification 6 Unit Truck loading matering Skid Tanjung Sekong PT. GRAMA BAZITA TENAGA Serang-Banten August 2011
60 Matering Skid for Depot Mini LPG Banjarmasin (AgrabudiKonsorsium?s Project) PT. GRAMA BAZITA TENAGA Banjarmasin July 2011
61 Desuperheater and Heatrecovery System For TanjungEnim Lestari PT. GRAMA BAZITA Palembang July 2011
62 Electrical & Instrument Work for Truck Loading and Ship Loading for Tanjung PT. GRAMA BAZITA TENAGA Cikarang July 2011
63 Survey Installation Material at Bandara Soekarno Hatta PT. KUARTA POWERINDO PERKASA Jakarta March 2011
64 Bulk Material And Consumable PT. KUARTA POWERINDO PERKASA Jambi March 2011
65 ATG Kualanamu PT. GRAMA BAZITA Medan February 2011
66 Instrument Installation and Calibration Service as Well as Electrical PT. KUARTA POWERINDO PERKASA Jambi January 2011
67 Supply And Fabrication Steel Support For North Geragai Project PT. KUARTA POWERINDO PERKASA Jambi January 2011
68 Developing logic from HIMA to SM Application FAT PT. HONEYWELL INDONESIA Jakarta October 2010 - October 2011
69 Hydrotest Tube 6mm CV. KADYTRA MULYA SEJATI - BLUE SCOPE STEEL Cilegon-Serang September 2010
70 Additional Installation Shut Down Valve 3220 PT. MEGARON SEMESTA - PT. PREMIER Batam September 2010
71 I & C Man Power Supply for Engineering, Commissioning and Startup. PT. ADHI KARYA PLTU SEBALANG 2 X 100 MW, LAMPUNG August 2010 - August 2013
72 Throttle Check Valves CV. KADYTRA MULYA SEJATI - BLUE SCOPE STEEL Cilegon-Serang August 2010 - August 2013
73 Supply Material And Demolition And Installation Clamp CV. KADYTRA MULYA SEJATI Cilengon-Serang August 2010
74 Hydrotest, Pickle oil and Remount Pipe CV. KADYTRA MULYA SEJATI - BLUE SCOPE STEEL Cilegon-Serang August 2010
75 Supply Material Plat SS CV. KADYTRA MULYA SEJATI Cilengon-Serang July 2010
76 Supply Material Tube Connector And Instalation CV. KADYTRA MULYA SEJATI Cilengon-Serang July 2010
77 Supply Material And Instrument CV. KADYTRA MULYA SEJATI Cilengon-Serang July 2010
78 Supply Material and Instrument Tubing Installation CV. KADYTRA MULYA SEJATI - BLUE SCOPE STEEL Cilegon-Serang July 2010
79 Supply Material And Hydraulic Pipe Installation CV. KADYTRA MULYA SEJATI Cilengon-Serang June 2010
80 Instrument Man Power Supply For Maintenance Contract at Pertamina Cilacap Through Grama Bazita PT. GRAMA BAZITA - PERTAMINA (PERSERO) Cil acap June 2010
81 E&I Work for Gajah Baru (GBCPP) Condensate Storage Vessel & Transfer Pumps PT. MEGARON SEMESTA - PT. PREMIER Batam May 2010

HAVE A IDEA? LET'S TALK.